Quote:
Originally Posted by Ehloo
Considering the lowering option. CARBAHN is local to me with Steve Dinan actually in the local shop. Pretty cool. System is 1500 and a Available unlike the KW which takes 3 weeks from Germany. They say max drop is around 1 inch. 9 hour install job for them. Seems like a long install
|
Yea, not sure with 9 hours install job.
Seems way too long for just a spring install.