No shit sherlock......

That what I said.

In a single tower cable stay bridge design, the tower has to be in place BEFORE the deck, as the cables that support the deck are connected to the top of the tower.
Correct, misread speed reading as had been instead of has even. My bad.

However tower DOES NOT have to be in place before deck

That was impossible using this globally accepted construction method.

It is stronger building it into deck section as was being done.

Again, Bridge was not a break if you sneeze piece, as witnessed by support during moving.

If it were, it would have collapsed during move.

Watch video and see where collapse started.