Quote:
Originally Posted by IK6SPEED
Tower had not been built.
|
No shit sherlock......
That what I said.
In a single tower cable stay bridge design, the tower has to be in place BEFORE the deck, as the cables that support the deck are connected to the top of the tower.
__________________
2017 X5 4.0dSE ~ Atlas Cedar:Ind.Amaro Brown Merino&Piano Blk, Sport Auto, DHP, Comfort seats, Cold weather pack, HK audio, Electric towbar, Sun protection glass.