View Single Post
      10-23-2021, 04:32 PM   #44
Tenac
Brigadier General
Tenac's Avatar
4594
Rep
3,544
Posts

Drives: All
Join Date: Mar 2019
Location: AZ

iTrader: (0)

Quote:
Originally Posted by JcLusso View Post
Call customer service and ask.
Alright called them, production is to start week 46 (Nov 15th). I asked about my options the guy I was talking to said all options are schedule on my build. He also said that during paint mine will sit for up to 3-4 weeks at that stage, since it will be pulled off and done at a different location.

I did ask him, about how I have been reading the shortages delaying builds or getting options removed. He told me my individual build will have all options chosen and that a delay is always a possibility but says my build does not show any indicator (what ever that means) of being delayed, like some other builds.

So I hope that all stays the same as what he said. lol
__________________
2022 M8 Comp Convertible
2023 718 Cayman GTS 4.0
2019 718 Cayman Base
2015 M235 Manual
On the list for the M2 CS
Appreciate 0