With a crew of 6 this job could easily be done in an hour and a half.
2 guys designated for jacking up the car (1 guy per car side)
2 guys designated for unscrewing the lugs (1 guy per car side)
2 guys loading wheels on 2-wheel dollies and pushing into truck.
In two minutes one car can be stripped of its wheels. This was a walk in the park operation for these guys as long as they stayed orchestrated.
|